Legion Lake South residential ADA pedestrian ramp upgrades and resurfacing

The City will upgrade pedestrian ramps to ADA standards in 2026 and 2027. The City will replace the pavement surface in 2027.

Key information

Dates

2026-2027

Location

Columbus Ave and 58th St E and Bloomington and 63rd St E

Diamond Lake

Project overview

This project is part of the on-going street maintenance program.

ADA pedestrian ramp upgrades

City staff will upgrade all existing pedestrian ramps to current Americans with Disabilities Act (ADA) standards in 2026 or 2027.

Resurfacing

City staff will resurface the streets in 2027. A new top layer of asphalt pavement will help extend the life of the streets. The new pavement should last at least 10 years.

Traffic impacts

The roads will be closed to traffic in intervals during milling and paving work for periods of time. Roads will remain open during the evenings and nights.

Project phase

This project is in progress.

Input

Design

In Progress

Complete

Contact us

Hazel Wolf

Supervisor Engineering Technician
Public Works

Phone

612-772-2524