Second Street North

The City will remove and replace 3,000 ft of brick pipes with clay pipes. This will eliminate existing cracks, holes, and fractures.

Key information

Dates

2022

Location

2nd St N from Broadway Ave to 10th Ave N.

North Loop

Project overview

We've determined the following sanitary sewer needs rehabilitation:

2nd St N from 10th Ave to Broadway

Year installed: 1891

What we'll do

The project will remove and replace about 3,000 feet of existing brick pipe with clay pipe. We'll also replace manholes in the area as part of this project.

Background

We assess sewer system conditions on a regular basis to:

  • Find infrastructure rehabilitation (rehab) needs
  • Check over the aging sewer system
  • Maintain and improve the system
  • Keep the system reliable

Using the condition and risk data, we focus on the sewers with the most rehab needs.

Project phase

This project is in the design phase.

Input

Design

In Progress

Complete

Contact us

Huy Le

Engineer I
Surface Water & Sewers
Public Works

Phone

612-499-3622