Overview

Your property must:
Read about the 4d affordable housing incentive program
You can receive a match of 70% of your project cost up to a maximum match of $50,000. The 70% match will be made up of your utility rebates plus your City match.
Grants, matches and rebates cannot exceed your total project cost.
Equipment must meet the recommended minimum efficiency guidelines. The Center for Energy and Environment (CEE) may recommend an exception to the guidelines.
You can apply if your project does one of the following.
Boiler | 91% AFUE |
Furnace | 96% AFUE or higher ECM motor |
Gas water heater tank < 75,000 BTU | .68 UEF |
Gas water heater tank > 75,000 BTU | 88% efficient |
Gas water heater tankless | .87 UEF |
Heat pump water heater | 3.5 EF |
Attic/roof insulation - pitch roof | R-49 and air sealing |
Attic/roof insulation - flat roof | Evaluated case by case |
Wall insulation | Minimum of R-11 |
Attic joist insulation | Minimum of R-10 |
Ventilation - bathroom exhaust | Multispeed with ECM motor |
Air source heat pumps (SEER, EER, HSFP) |
Central: 16 SEER (10.5 EER), HSFP 9.5 Non-ducted: 16 SEER (9.0 EER), HSFP 10.6 |
Air source heat pumps (SEER2, EER2, HSFP2) |
Central: 15.2 SEER2 (10 EER2), HSFP2 8.1 Non-ducted: 16 SEER2 (9.0 EER2), HSFP2 9.5 |
Rooftop Unit |
<5.4 Tons: 15 SEER or greater >5.4 Tons: 12 EER and 13 IEER or greater |
The first thing you should do is schedule an energy audit.
We recommend scheduling the audit at least one month before the application is due.
Contact the Center for Energy and Environment (CEE) to get started.
Minneapolis Health Department
Phone
Address
Public Service Building