North Loop Pedestrian Improvement Project

 

Sign up for email updates for North Loop Paving & Pedestrian Enhancements:

Email Updates
To sign up for updates or to access your subscriber preferences, please enter your contact information below.
 

 Project Location

 NLPedestrian-ScopeMap-Dec-17

 

Project Status

CIP Status Stage 1: Planning

Project Materials

Open House 1 Boards - Introduction

Open House 2 Boards - Preliminary Design

Open House 2 - Preliminary Layout

 

Project Details

Project Description:
The project will improve safety for pedestrians and bicyclists by improving pedestrian and bicycle crossways at 22 intersections in the North Loop area by adding a combination of curb extensions, pedestrian crossing medians, Accessible Pedestrian Signals (APS), ADA compliant curb ramps, durable crosswalk markings, and upgrades to existing signals to add leading pedestrian intervals.

Project Location:
The North Loop is generally bounded by Plymouth Ave on the north, 1st Ave on the south, the Mississippi, river on the east, and 4th St N on the west.

Construction Date:
This project is scheduled to be completed in 2019.

Construction Duration:
TBD.


  

Meetings

The City of Minneapolis Department of Public Works will be holding a series of public meetings to gather feedback regarding the proposed project. The first two public meetings will be held at the dates below, with a third final public meeting scheduled tentatively for November 2017.

 

Public Meeting #1, Introductory Open House:
Minneapolis Central Library, Doty Board Room-N280
300 Nicollet Mall, Minneapolis, MN 55401
Monday, July 24th, 2017
Open House Hours, 5:30 p.m. – 7:00 p.m.

 

Public Meeting #2, Preliminary Concepts Open House:
Minneapolis Central Library, Doty Board Room-N280
300 Nicollet Mall, Minneapolis, MN 55401
Tuesday, August 29th, 2017
Open House Hours, 5:30 p.m. – 7:00 p.m.

 

Heritage Preservation Commission, Introductory Presentation
Minneapolis City Hall, Room 317
350 South 5th Street, Minneapolis, MN 55415
Tuesday, December 12th, 2017 

Meeting begins at 4:30pm. Item location on the agenda TBD.

 

Public Meeting #3, Final Preliminary Concept:
Expected in January or February 2018. Time, date and location to be determined. 

 

Project Updates

8/29/17 The second project open house will be held from 5:30pm - 7:00pm at Minneapolis Central Library

8/28/17 The introductory project survey has been closed

8/2/17 Project staff attended a Minneapolis Advisory Committee on People with Disabilities (MACOPD) meeting to introduce the project

7/24/17 The introductory open house was held at Minneapolis Central Library

7/26/17 Project staff attended a North Loop Neighborhood Association meeting to introduce the project

7/20/17 Project staff attended the City's Pedestrian Advisory Committee to introduce the project

7/18/17 Project staff attended a 2020 Partners meeting to introduce the project

7/18/17 Project staff attend the City's Bicycle Advisory Committee to introduce the project

7/11/17 Meeting notifications for the upcoming open houses have been sent to property addresses in the area.

 

Project Contacts 

Forrest Hardy, Project Planner, 612-673-5951 or [email protected]

Adam Hayow, Project Engineer, 612-673-2172 or [email protected]

 

 

See also, related 2019 project: North Loop Paving 

 

 

Last updated Dec 1, 2017

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

CONNECT

311 call center

TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Minneapolis 14 Government TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo