The City of Minneapolis proposes to reconstruct Hennepin Avenue South between Lake Street West and 36th Street West.

The proposed 0.75-mile long project is scheduled to occur over the course of the 2018 construction season and will consist of improvements to the roadway, sidewalk, and utilities. The scope of the project will encompass the entire right-of-way and include full removal of the existing street, subgrade correction, new pavement, curb and gutter, driveways, curb extensions, sidewalk as needed, utility work as needed, pavement markings, signals, and signage. The project will also include streetscape improvements including trees planted in the boulevard, where feasible, and pedestrian-level lighting.

City staff is currently in the preliminary stages of planning and design for the project, which will be accompanied by community outreach activities that will help inform and guide design concepts.

Project Limits:
Hennepin Avenue South between Lake Street West and 36th Street West

Construction Start Date:
2018

Duration of Construction:
TBD

Traffic Impact:
TBD

Schedule

Anticipated project schedule (subject to change):

Meetings

Open House #1

January 25, 2017, 6-8pm
Bryant Square Park Recreation Center
3101 Bryant Avenue South

Open House #1 Notice Letter (sent 1/11/17)

Open House #1 Materials (updated 1/26/17)

Open House #1/Survey Summary (updated 2/21/17)

Open House #2

March 9, 2017, 6-8pm
Bryant Square Park Recreation Center
3101 Bryant Avenue South

Open House #2 Notice Letter (sent 2/27/17)

Open House #2 Materials (updated 3/10/17)

Lake Street to 31st Street Concepts 1A-1D (updated 3/10/17)

31st Street to 36th Street Concepts 2A-2C (updated 3/10/17)

Project Documents

Project Fact Sheet  (updated 2/24/17)

2017 Assessment Info Packet (updated 1/25/17)*

*This packet provides general information about uniform assessment rates and how the City of Minneapolis calculates influence areas for projects like Hennepin Avenue. Public Works will not have project assessment information about individual parcels until late 2017 or early 2018.

Project Updates

January 5, 2017: Public Works is hosting a project open house with the CARAG and ECCO neighborhoods on January 25, 2017 from 6-8 p.m. at the Bryant Square Park Recreation Center (3101 Bryant Avenue South). All are welcome to attend.

January 6, 2017: The project will be presented to the Bicycle Advisory Committee Engineering Subcommittee on Tuesday, January 17, 2017 between 4:00-6:00 p.m. at the Colonial Warehouse Building, 212 3rd Avenue North, Suite 404 and the Pedestrian Advisory Committee, Infrastructure & Engineering Subcommittee on Thursday, January 19, 2017 between 4:30-6:00 p.m. at Minneapolis City Hall, 350 5th Street South, Room 212.

January 25, 2017: Those interested in the Hennepin Avenue reconstruction project are encouraged to take this short, 10-minute survey about the project corridor. Your input is important and will help inform the design of the street.

January 26, 2017: The materials presented at the January 25, 2017 open house have been posted in the Open House #1 section above..

February 24, 2017: Public Works is hosting a second project open house with the CARAG and ECCO neighborhoods on March 9, 2017 from 6-8 p.m. at the Bryant Square Park Recreation Center (3101 Bryant Avenue South). Project staff will be on hand to share different concepts for the street, seek feedback, and answer questions. All are welcome to attend.

March 9, 2017: The project will be presented to the Bicycle Advisory Committee Engineering Subcommittee on Tuesday, March 14, 2017 between 4:00-6:00 p.m. at the Colonial Warehouse Building, 212 3rd Avenue North, Suite 404 and the Pedestrian Advisory Committee, Infrastructure & Engineering Subcommittee on Thursday, March 16, 2017 between 4:30-6:00 p.m. at Minneapolis City Hall, 350 5th Street South, Room 212.

March 10, 2017: The materials presented at the March 9, 2017 open house have been posted in the Open House #2 section above, including concept options for the design of the Lake Street to 31st Street segment and 31st Street to 36th Street segment. Based on community feedback and further technical review, Public Works will select a preferred concept and provide a recommendation to City Council this spring. Please provide feedback on the corridor concepts to project staff by March 27, 2017 - see contact details below.

 

Contacts

Simon Blenski, Project Planner, 612-673-5012 or Simon.Blenski@minneapolismn.gov

Debra Jacobs, P.E., Project Engineer, 612-673-2463 or Debra.Jacobs@minneapolismn.gov

 

Sign up for email updates on this project:

Email Updates
To sign up for updates or to access your subscriber preferences, please enter your contact information below.

 

 

P1010290.JPG  P1010302.JPG

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

Last updated Mar 17, 2017

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

CONNECT

311 call center

TTY relay service

 

facebook25x25 twitter25x25 youtube25x25 Minneapolis311icon logo tv 14 footer icon image linkedin_32x32




mpls-logo-white120