Emerson & Fremont Avenues North, Pedestrian Improvements and Protected Bikeway

 

Project Description/Overview: Emerson Ave N and Fremont Ave N are scheduled to receive pedestrian and bicycle improvements in 2018. The goal of the project is to improve pedestrian crossings and to increase the safety of the existing bike facility on the corridor. There is an expected traffic calming benefit to the improvements as well. Pedestrian improvements will include curb bumpouts and pedestrian shelter medians. These will reduce crossing distances and improve sight lines for pedestrians.

Bicycle improvements include a protected bikeway along Emerson and Fremont from Plymouth Ave N to 33rd Ave N. This will be installed with on-street pavement markings and plastic delineators (posts). This bikeway will be similar to  type of bikeway recently installed on Plymouth Ave N, east of Lyndale Ave N. A left-side running bike lane is necessary to reduce impact to current and future transit operations. Therefore, parking is proposed to shift from the left-hand side of the street to the right-hand side of the street on Emerson Ave N from Plymouth - West Broadway, and on Fremont Ave N from Lowry to Plymouth. The quantity of street parking along the corridor will remain approximately the same. Though there is expected to be a loss of one parking spot at the location of each curb bumpout.

 

Project Limits: Pedestrian Improvements: Plymouth Ave N to 44th Ave N. Protected Bikeway: Plymouth Ave N to 33rd Ave N

Project Concept Layout:  Project Overview Map  Pavement Marking Layout

Construction Start Date: 2018

Duration of Construction: 1 construction season

Traffic Impact: Implementation of the protected bikeway requires reducing Emerson Avenue  N to one travel lane, similar to the current configuration of Fremont Ave N. A traffic model was used to study the potential traffic impacts of this lane reduction along with future D-Line bus operations on the corridor. The lane reduction was determined to be feasible. A left-side running bike lane was shown to present the least conflict with bus operations and also reduced general traffic impacts during the PM-peak hour. Additional turn lanes are necessary at major intersections in order to reduce travel delays and impacts to transit operations. During construction, temporary lane shifts and closures should be expected.

Public Meeting Info: 

Project Presentation and Q&A - March 20th, 2017 at 6:30pm - North Regional Library (Northern Meeting Room) 1315 Lowry Ave N. 

Project Open House - March 13th, 2017 - Stop by anytime from 4pm - 7pm - North Commons Park Recreation Center - 1801 James Ave N Room 112

 The project was also brought for discussion at 5 neighborhood organizations along the corridor in February 2017.

Meeting Notification Postcard

Project Contact: Forrest Hardy, Transportation Planner - Forrest.Hardy@MinneapolisMN.Gov 612-673-5951

Open House Boards: 

 

Existing Site Photos:

Emerson Ave N (Plymouth Ave N - 33rd Ave N)

Emerson-existing-new

 

Fremont Ave N (Plymouth Ave N - Lowry Ave N)

Fremont-existing-1

 

Fremont Ave N (Lowry Ave N - 44th Ave N)

Fremont-existing-2

 

 

 

 

 

 

 

 

 

 

 

 

Last updated Mar 12, 2017

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

CONNECT

311 call center

TTY relay service

 

facebook25x25 twitter25x25 youtube25x25 Minneapolis311icon logo tv 14 footer icon image linkedin_32x32




mpls-logo-white120