SW034 Flood Area 21 - Bloomington Pond

 

 

 

Project Status

CIP Status Stage 1: Planning

Project Details

About:
The goal of this project is to protect homes and businesses near Bloomington Pond from flooding and to improve water quality. The existing Bloomington Pond was constructed in 1988, but flooding problems persist. This area had reported flooding in 1978,1987,1992, and 1997. The affected areas have a total property value of $9 million, using 2006 estimated market values. The project design includes a study to develop feasible solutions for reducing flooding, increasing drainage capacity and improving water quality in the sewer shed this project is located in, which drains to Lake Hiawatha.

Project Location:
Bloomington Pond, North of E 42nd St, Bloomington Ave S, South of E 40th Street, East of 12th Ave S.

Construction Start Date:
This project is scheduled to begin in 2019.

Project Contacts

Contact: Kelly Moriarity, 612 673-3617 or Kelly.Moriarity@minneapolismn.gov

 

Last updated Jun 14, 2017

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

CONNECT

311 call center

TTY relay service

 

facebook25x25 twitter25x25 youtube25x25 Minneapolis311icon logo tv 14 footer icon image linkedin_32x32




mpls-logo-white120