Sanitary Sewer Improvements

The City of Minneapolis makes regular improvements and repairs to the existing sanitary sewer network. Learn more about this year's improvements below.

2020 Sewer Main Repairs

13th Ave S

Project Status: Construction

Anticipated Start of Construction

September 2019

Scope of Project

Remove and replace sewer main along 13th Ave S from 31st St E to Lake St E.

Project Description

Remove and replace 259 ft of 12-in VCP sewer and adjacent manholes.

Traffic Impact

Minimal effect on residential and general traffic. A traffic control plan is available upon request.

Beard Ave S

CIP Status Stage 2: Design

Anticipated Start of Construction

June 2020

Scope of Project

Remove and replace sewer main along Beard Ave S from 51st St to 50th St W.

Project Description

Remove and Replace 160 LF of 9” VCP sanitary main with 10” VCP and connecting MHs. This will improve sanitary flow and reduce the necessary cleaning frequency.

Traffic Impact

 Minimal effect on residential and general traffic.

Contact

Henneh Kota, Project Manager, 612-673-2505, [email protected]

35th Ave NE and Tyler St NE

CIP Status Stage 2: Design

Anticipated Start of Construction

Spring 2020

Scope of Project

Remove and replace storm sewer pipe on 35th Ave NE from Central Ave NE to Ulysses St NE and Tyler St NE from 35th Ave NE to 36th Ave NE.

Project Description

Public Works is coordinating implementation of storm drain projects from the 1NE watershed study with upcoming street and other improvement projects as feasible. (See https://www.mwmo.org/planning/northeast-stormwater-management-initiative/ for full 1NE watershed study)

The 35th Ave NE and Tyler St project is the second project to be implemented of the study. About 4300 feet of storm drain pipe will be replaced with larger pipes at this location to reduce surface flooding. Manholes and catch basins in the project area will also be replaced. 

Traffic Impact

During construction, residents, businesses, and visitors may face: traffic detours, noise, vibration, and dust in work areas. The following temporary impacts may include: lane restrictions, intersection reductions, parking restrictions, and/or revised pedestrian and bicycle routes. Residents will have access to their property throughout construction. We will continue to post construction and traffic detour information.

Contact

Lisa Goddard, Project Manager, 612-673-2096, [email protected]

15th St E

CIP Status Stage 2: Design

Anticipated Start of Construction

TBD

Scope of Project

Remove and replace sewer main along 15th St E, from 3rd Ave S to 4th Ave S.

15th St E Sewer Repair Map

Project Description

Remove, replace and reroute segments of brick, ductile iron, and reinforced concrete pipe along 15th St E. This will improve sanitary flow and reduce the necessary cleaning frequency.

Traffic Impact

 Traffic entering onto I-94W may be affected.

30th Ave S

CIP Status Stage 2: Design

Anticipated Start of Construction

TBD

Scope of Project

Remove and replace sewer main along 30th Ave S, from 42nd St E to 44th St E.

Project Description

Remove and replace 700 ft of 9-in and 12-in VCP sewer and adjacent manholes.

Traffic Impact

 Minimal effect on residential and general traffic.

42nd St E

CIP Status Stage 2: Design

Anticipated Start of Construction

TBD

Scope of Project

Remove and replace sewer main along 42nd St E, from 19th Ave S to 20th Ave S.

Project Description

Remove and replace 175 ft of 9-in and 10-in VCP sewer and adjacent manholes.

Traffic Impact

 Minimal effect on residential and general traffic.

Knox Ave S

CIP Status Stage 2: Design

Anticipated Start of Construction

TBD

Scope of Project

Remove and replace sewer main along Knox Ave S, from 56th St W to 58th St W.

Knox Ave S Sewer Repair Map

Project Description

Remove and replace 180 ft of 9-in VCP sewer and adjacent manholes.

Traffic Impact

 Minimal effect on residential and general traffic.

Wenonah West

CIP Status Stage 2: Design

Anticipated Start of Construction

2020

Scope of Project

Remove and replace sewer main  and install a Lift Station at the intersection of 54th St E and 29th Ave S.

Project Description

The pipe connecting to the MCES Interceptor is too low and it is backing up city sewer flow when these pipes are near or over capacity. By rehabilitating the pipes and adding a lift station, it will alleviate future sewer backup.

Traffic Impact

 Minimal effect on residential and general traffic.

Contact

Huy Le, Project Manager; 612-499-3622 or [email protected]

2019 Sewer Main Repairs

Hoyer Heights

Project Status: Completed

This project was completed in 2019.

Scope of Project

Remove and replace sewer main in multiple location within the Hoyer Heights subdivision of the Waite Park neighborhood.

See the full Hoyer Heights reconstruction project.

Project Description

Abandon existing sewers from backyards and relocate into the streets via open-cut excavation. Remove and replace sewer main and adjacent manholes.

Traffic Impact

 Minimal effect on residential and general traffic.

Humboldt Ave S

Project Status: Completed

This project was completed in 2019.

Scope of Project

Remove and replace sewer main along Humboldt Ave S, from 28th St W to Lagoon Ave.

Project Description

Remove and replace 140 ft of 12-in VCP sewer and adjacent manholes.

Traffic Impact

 Minimal effect on residential and general traffic.

Lake Harriet Pkwy

Project Status: Completed

This project was completed in 2019.

Scope of Project

Remove and replace sewer main along Lake Harriet Pkwy, from 44th St W to 46th St W.

Project Description

Remove and replace 122 ft of 9-in VCP sewer and adjacent manholes.

Traffic Impact

 Minimal effect on residential and general traffic.

McNair Ave S

Project Status: Completed

This project was completed in 2019.

Scope of Project

Remove and replace sewer main along McNair Ave N, from Upton Ave N to Thomas Ave N.

Project Description

Remove and replace 215 ft of 9-in VCP sewer and adjacent manholes.

Traffic Impact

 Minimal effect on residential and general traffic.

Plymouth Ave N

Project Status: Completed

This project was completed in 2019.

Scope of Project

Remove and replace sewer main along Plymouth Ave N, from Washington Ave N to 2nd St N.

Project Description

Remove and replace 415 ft of 24-in brick pipe with VCP. This will eliminate existing settled, compacted debris in the pipe, and repair VCP sewer and adjacent manholes.

Traffic Impact

 Will affect general traffic.

Contact

Huy Le, Project Manager; 612-499-3622 or [email protected]

Future Sewer Main Repairs

2nd St N

CIP Status Stage 2: Design

Anticipated Start of Construction

April 2020

Scope of Project

Remove and replace sewer main along 2nd St N from Broadway Ave to 10th Ave N.

Project Description

Remove and replace 3,000 ft of brick pipes with VCP. This will eliminate existing cracks, holes, and fractures.

Traffic Impact

 Traffic will be closed on 2nd St N and redirected onto Washington Ave N.

Contact

Huy Le, Project Manager; 612-499-3622 or [email protected]

 Storm Sewer Repairs

Alley Storm Repairs

CIP Status Stage 2: Design

Scope of Project

We’ll be replacing the existing underground storm infrastructure in various alleys throughout Minneapolis.

Project Description

Alley storm drains are some of the oldest pipes in the city's system, and they need to be repaired. Replacing the existing pipes will prevent failure and future drainage issues. We'll also replace the alley surfaces affected by this work.

Alley locations for 2020 include:

  • 33rd Ave N alley at Newton Ave
  • 42nd St alley at Minnehaha Ave
  • 46th St alley at Hiawatha Ave
  • 51st St alley at 39th Ave S
  • 35th St alley at 17th Ave S
  • 39th Ave alley at Dupont Ave N
  • 44th St alley at Oakland Ave S
  • 33rd St alley at Snelling Ave
  • 34th St alley at 15th Ave S
  • 37th St alley at 20th Ave S
  • 39th St alley at Snelling Ave
  • 2nd St alley at Sheridan Ave S

Traffic Impact

The alley will be closed to traffic. However, crews on site will provide access to your garage if required. Please give them ample time to provide access if there is an excavation next to your property.

Contact

Will Shutte, Project Manager; 612-673-3606 or [email protected]

 

Last updated Mar 25, 2020

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-263-6850.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

Public Works  ©1997-2020 City of Minneapolis, MN

CONNECT

311 call center

311 TTY relay service

City of Minneapolis Facebook City of Minneapolis Twitter City of Minneapolis YouTube ChaNNEL Minneapolis 311 Watch Minneapolis City Council TV City of Minneapolis LinkedIn

Minneapolis, City of Lakes logo