Washington Ave (CSAH)
Project Type:
Total street reconstruction including pavement, curb and gutter, driveways, storm drain, sidewalks, and signal modifications.
Project Limits:
This project is located in downtown Minneapolis on Washington Avenue from Hennepin Ave to 5th Ave S.
Construction Start Date:
The project is scheduled for 2014 at this time.
Length of Construction:
Unknown at this time
Traffic Impact:
Unknown at this time
Contacts: Project Engineer: Beverly Warmka 612-673-3762
Project Updates:
Hennepin County will be working on the project design in 2012. For additional information, see Hennepin County's webpage.
(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.
Last updated Apr. 16, 2013
