38th Street East (Hiawatha Ave - Minnehaha Ave)

Project Type:
Total street reconstruction including pavement, curb and gutter, driveways, storm drain, sidewalks and signal modifications.

Project Limits:
This project is located on 38th St E between Hiawatha Ave and Minnehaha Ave.

Construction Start Date:
The project is scheduled for 2016.

Duration of Construction:
Unknown at this time 

Traffic Impact:
Unknown at this time 

Public Meetings:
October 8, 2014
5:00 PM
Minnehaha Communion Lutheran Church
4101 37th Avenue South
Minneapolis, Mn 55406

Notes from 9-17-14 Meeting

Layout:
Design Option 1 - May 27, 2014
Reconstruction FAQ
Assessment Package 2014 Example


Sign up for e-mail updates on this project

Contact: Project Engineer: Chris Engelmann 612-673-3274

Project Updates:
Stakeholder Letter - August 29, 2014

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

 

Last updated Sep 30, 2014