Public Works

350 South 5th Street
RM 203 City Hall
Minneapolis, MN  55415-1390

Minnehaha Ave location map

Minnehaha Ave (24th-26th Sts E)

Project Type:
Total street reconstruction including pavement, curb and utter, driveways, storm drain, sidewalks and signal modifications.

Project Limits:
This project is located on Minnehaha Ave between 24th St E and 26th St E.


Construction Start Date:
The project is shceduled for 2015.

Length of Construction:
Unknown at this time

Traffic Impact:
Unknown at this time

Meetings:
August 19, 2014

Contact: Bev Warmka 612-673-3762

Project Updates:
Sign up for email updates on this project.

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

Last updated Sep 9, 2014