cso 7 location map

CSO Area 007

Project Type:
This is a s sewer separation and flood mitigation project.  The goal is to help protect the homes in the area of the 2900 block of Upton Ave N from damage caused by localized street flooding for a "100-year" rain storm event.  It also reduces combined sewer overflows by separating the storm sewers from sanitary sewers at three locations:
 - Alley draining to 29th Ave N - between Thomas Ave N & Sheridan Ave N
 - Alley draining to 29th Ave N - between Sheridan Ave N & Russell Ave N
 - Sheridan Ave N between 29th Ave N & 30th Ave N


Project Limits: The area between 29th and 30th Aves N from Upton Ave N to Logan Ave N.

Construction Start Date: May 19, 2014

Duration of Construction: 10 months

Traffic Impact: Intermittent lane closures and parking restrictions.

Contact: Seifedin Burka 612-673-2414

Project Updates:
Look for updates here.

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

Last updated Apr 23, 2014