Penn Ave S Paving

Project Type:
The project will include removal and replacement of the pavement, curb and gutter, driveway aprons, storm drain inlets, and signal upgrades.

Layout

Project Limits:
The project is located in south Minneapolis on Penn Ave South between 50th Street West and 54th Street West.

Construction Start Date: 
Late May - Early June 

Duration of Construction:
2014 construction season.

Traffic Impact:
Once construction begins, Penn Ave S will be closed to through traffic south of W 50th St to north of W 54th St; both W 54th and W 50th Streets will remain open.  Access to local businesses and residences will be maintained for a majority of the work.
Detour map

Contacts:
Stephanie Malmberg, Construction Engineer, 612-673-3365
Bev Warmka, Design Engineer, 612-673-3762

GovDelivery Sign up for e-mail updates on this project.

Project Updates:
September 4, 2014
July 30, 2014
July 18, 2014
July 8, 2014
June 26, 2014

June 20, 2014
June 13, 2014
June 5, 2014
May 30, 2014
April 25, 2014
April 8, 2014

f logo

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

 

Last updated Sep 4, 2014