East Minnehaha Parkway Resurfacing

Project Type:
This is a Parkway Paving project. The existing asphalt roadway surface will be profiled and new asphalt will be placed on the roadway. Seven inches of existing pavement will be milled (removed) and replaced. The existing roadbed is native soils, so the initial work days will alternate milling and asphalt placement. This will be done to protect the roadbed from the elements, which may cause damage. When this is complete, additional layers of asphalt will be placed and the manholes will be raised to the correct elevation.  Ped ramps will be replaced to meet ADA standards

Project Limits:
The E Minnehaha Parkway Resurfacing Project is located on E Minnehaha Parkway from 27th Ave S to 38th Ave S and E Minnehaha Parkway from  Longfellow Ave to Cedar Ave.

Construction Start Date:
Week of July 14th, 2014

Length of Construction:
Five to seven weeks

Traffic Impact:
Detours and full road closures will be in place.  The project area will have no parking signs posted in front of homes and businesses.  Vehicles parked in violation of signage will be towed to the City of Minneapolis impound lot.

Project Contact: 
Chris Trembath  612-919-1196

Project Updates:
June 23, 2014: Any residents that has landscaping, irrigation systems or decorative plantings on City of Minneapolis rigt-of-way should remove those items beofre the project starts.

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.