Public Works

350 South 5th Street
RM 203 City Hall
Minneapolis, MN  55415-1390

10th Ave SE Br Location Map

10th Ave SE Bridge Rehabilitation

Project Type:
The project proposes to rehabilitate a bridge over the Mississippi River and West River Parkway. It will preserve the major capital investment by repairing deteriorated concrete areas on the spandrel columns, floor beams, and arches.

If the structure is allowed to continue to deteriorate, rehabilitation will no longer be cost effective. Total structure replacement of this bridge is expensive.

Project Limits:
The project is located east of downtown Minneapolis on 10th Ave SE over the Mississippi River from approximately W River Parkway to 2nd St SE.

Construction Start Date:
This project has moved to the 2015 - 2016 construction season.

Duration of Construction:
Unknown at this time

Traffic Impact:
Unknown at this time 

Contacts:  Meseret Wolana  612-673-3527

Project Updates:
Link to more information

 

Last updated Jun 13, 2014