Minneapolis Department of Public Works

Public Works

350 South 5th Street
RM 203 City Hall
Minneapolis, MN  55415-1390

Alley flooding location map

 

Alley Flooding at 2552 Hennepin

 

Project Type:

This is a storm sewer improvement project reduce surface flooding.  Flooding has been reported in the alley behind the property at 2532 Hennepin Ave.  The alley is unusually deep with the lowest point about 8 to 10 feet below the surrounding area.

 

This project will consist of installation of a new storm pipe in the alley and draining it towards the south to 26th St W and connecting it with the existing storm pipe.

 

Project Limits:
Alley behind 2532 Hennepin Ave south to 26th St W

 

Construction Start Date:
2013 Construction Season

 

Length of Construction:
To be determined

 

Traffic Impact:
To be determined

 

Contact: Seifedin Burka 612-673-2414

 

Project Updates:
Look for project updates here.

(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.)  Citizens concerned with pedestrian access during construction should contact the project manager directly.

 

 

Last updated Jan. 10, 2013