
Alley Flooding at 2552 Hennepin
Project Type:
This is a storm sewer improvement project reduce surface flooding. Flooding has been reported in the alley behind the property at 2532 Hennepin Ave. The alley is unusually deep with the lowest point about 8 to 10 feet below the surrounding area.
This project will consist of installation of a new storm pipe in the alley and draining it towards the south to 26th St W and connecting it with the existing storm pipe.
Project Limits:
Alley behind 2532 Hennepin Ave south to 26th St W
Construction Start Date:
2013 Construction Season
Length of Construction:
To be determined
Traffic Impact:
To be determined
Contact: Seifedin Burka 612-673-2414
Project Updates:
Look for project updates here.
(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.
Last updated Jan. 10, 2013
