CSO Area 007 &
Flood Area 64
Project Type:
This is a flood control and combined sewer overflow (CSO) removal project. The goal is to help protect the homes in the area of the 2900 block of Upton Ave N from damage caused by localized street flooding for a “100-year” rain storm event. It also allows combined sewer overflow to be disconnected from the sanitary sewer on the 2900 block of Sheridan Ave N.
Project Limits: The area between 29th and 30th Aves N from Upton Ave N to Logan Ave N.
Construction Start Date: 2013
Length of Construction: To be determined
Traffic Impact: To be determined
Contact: Seifedin Burka 612-673-2414
Project Updates:
Look for project updates here.
(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.
Last updated Jan. 10, 2013