61st Street West Reconstruction

61st St W

Project Status

CIP Status Stage 3: Preconstruction 

Project Details

Project Description/Overview: 61st St W is scheduled to be reconstructed from Lyndale Ave S to Nicollet Ave S in 2018. A reconstruction project typically includes a new road surface, sub-base, curbs, sidewalk, boulevard space and utilities as needed. The City right of way on 61st St W is limited to 50 feet in width. The street is in poor condition and much of the existing sidewalk is not ADA compliant. The initial project concepts show new and expanded sidewalk space with curb bumpouts to improve pedestrian crossings, and new boulevard space where feasible. Due to limited right of way space, these new amenities are achievable only through a reduction in street width. The preliminary concepts at the link below show different options for how this space could be reutilized.

Project Limits: Lyndale Ave S to Nicollet Ave S

Construction Start Date: 2018

Duration of Construction: 1 construction season

Traffic Impact: Lane closures and /or detours expected during construction

Existing Site Photos:

61stStW-WestEnd     61stStW-EastEnd

 

Project Meetings

Public Meeting Info: 

Final project meetings were be held on April 12th, 2017, one in the afternoon, one in the evening. A staff recommended concept was presented at this meeting and additional feedback was collected. Location details were as follows:

April 12th afternoon meeting: City of Minneapolis, Maintenance Facility 6036 Harriet Ave S, Minneapolis 55419 (meet in the lunchroom)

April 12th evening meeting: Windom South Recreation Center 5843 Wentworth Ave S, Minneapolis 55419 (meet in the multipurpose room) 
 

Two project open houses were held on March 15th, one in the afternoon, one in the evening. Property owners along the corridor were mailed a letter notifying them of the meeting. Public Works staff gathered feedback to incorporate into future design iterations.

Afternoon Open House, March 15th 1pm - 3pm - City of Minneapolis Maintenance Facility, Lunch Room - 6036 Harriet Ave S, Minneapolis, MN 55419

Evening Open House, March 15th  5:30pm - 7:30pm - Windom South Recreation Center, Multi-Purpose Room - 5843 Wentworth Ave S, Minneapolis, MN 55419

 

Meeting notifications were mailed to property owners within an approximate 300' radius from the corridor.

Open house notification letter

 

 

Project Updates

Layout approval: The staff recommended project layout was approved at the May 16th, 2017 City Council Transportation and Public Works Committee meeting. Materials from this meeting can be found here.

Recommended project layout: Public Works staff have developed a recommended project layout which combines elements from each of the previous design options and incorporates further site analysis and stakeholder feedback: Recommended project layout link 

Preliminary Design Options: Layout 1, Layout 2 (Note: These are preliminary concepts for the purpose of gathering community and stakeholder feedback. Staff will incorporate this feedback into a final recommended design that may take elements from both of these layouts.)

Project Summary Sheet: 61st St W - Summary Sheet

 

Email Updates
To sign up for updates or to access your subscriber preferences, please enter your contact information below.

Contacts

Beverly Warmka, Project Engineer - [email protected]  612-673-3762

Forrest Hardy, Transportation Planner - [email protected]   612-673-5951

 

Last updated Mar 30, 2018