5th Street Reconnection (Samatar Crossing)

54th St W location map

Project Status 

CIP Status Stage 2: Design
 

Project Details

The City of Minneapolis proposes to reconnect 5th Street South between 11th Avenue South and 15th Avenue South as a local multimodal connection that will include an off-street bicycle facility, and an enhanced pedestrian walkway. 

Project Type:
Construction and Reconstruction

Project Limits:
Connecting 11th Avenue South to 15th Avenue South

Construction Start Date: 
2016

Length of Construction:
TBD

Traffic Impact:
TBD

Public Meetings:

Preconstruction Open-House
Date, Time, and Location TBD

Project Information:
Project Layout

 

Project Updates

Future updates will be posted here.

 

Contacts 

Steven Hay, Planning, 612-673-3884

Meseret Wolana, Engineering and Design, 612-673-3527


(Note: Project information may change due to scheduling, weather, or other factors outside of our control. Listings will be updated as new information becomes available.) Citizens concerned with pedestrian access during construction should contact the project manager directly.

Last updated Jun 15, 2017

QUICK LINKS

Home

Contact us

Email updates

Find a service

About this site

For employees

Accessibility:
For reasonable accommodations or alternative formats, contact 311.
People who are deaf or hard of hearing can use a relay service to call 311 at 612-673-3000.
TTY users can call 612-673-2157 or 612-673-2626.

Para asistencia 612-673-2700, Yog xav tau kev pab, hu 612-637-2800, Hadii aad Caawimaad u baahantahay 612-673-3500. 

CONNECT

311 call center

TTY relay service

 

facebook25x25 twitter25x25 youtube25x25 Minneapolis311icon logo tv 14 footer icon image linkedin_32x32




mpls-logo-white120