Public Works

350 South 5th Street
RM 203 City Hall
Minneapolis, MN  55415-1390

Alleys:
Alley Renovation  
Bike/Ped Trails:
U of M Trail 
Bridges:
15th & 16th Ave S Bridges 
Midtown Corridor Bridge Preservation Program 
Plymouth Bridge 
Van White Bridge & Paving 
Miscellaneous:
Sewer Pipe Lining (Summer 2013) 
Smoke Testing 2013 
Traffic Signal Retiming 
Parkway Paving:
Minnehaha Parkway (Cedar-27th) 
West River Road 
Sewer/Storm Drain:
CSO Area 007 & Flood Area 64  
Rain Leader Disconnect (Johnson & 28th) 
Street Reconstruction:
31st St E 
46th St W 
Nicollet Ave 
Penn Ave S
Winter St NE Paving Area 
Street Resuracing:
11th, Grant, 14th & 5th 
25th St E 
28th Ave S 
31st Ave S 
31st St W 
35th St E 
38th St W 
42nd Ave S 
46th Ave S 
50th St W 
54th St E 
Cooper Residential 
Linden Hills Residential 
Lyndale Ave S 
North Dorman Residential 
Oak Lake & 10th Ave N 
Page Residential 
Stevens Ave 
Upton Ave S 

2013 map

11th, Grant, 14th 5th Resurfacing 25th St E Resurfacing Page Residential Resurfacing 28th Ave S Resurfacing 28th Ave S Resurfacing 31st Ave S Resurfacing 35th St E Resurfacing 35th St E Resurfacing 31st St W Resurfacing 38th St W Resurfacing 42nd Ave S Resurfacing 46th Ave S Resurfacing 50th St W Resurfacing 54th St E Resurfacing Cooper Residential Resurfacing Cooper Residential Resurfacing Cooper Residential Resurfacing Linden Hills Residential Resurfacing Lyndale Ave S Resurfacing North Dorman Residential Resurfacing North Dorman Residential Resurfacing Oak Lake & 10th Ave N Resurfacing Stevens Ave Resurfacing Winter St NE Paving 31st St E Paving Nicollet Ave Paving 46th St W Paving Penn Ave S Paving Minnehaha Parkway Paving Minnehaha Parkway Paving Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Alley Renovation Van White Paving & Bridge Project Plymouth Ave Bridge Rehabilitation W River Road Parkway Alley Renovation Alley Renovation Alley Renovation U of M Bicycle Trail 2013 Street and Alley Sealcoating Projects Midtown Corridor Bridge Preservation Program 15th & 16th Ave S Bridges CSO Area 007 & Flood Area 64 Rain Leader Disconnect - Johnson St & 28th Ave NE Traffic Signal Timing Spring Sewer Pipe Lining Upton Ave S Resurfacing 2013 Smoke Testing

Last updated Apr 18, 2014