5th St SE Bikeway

Project Type

Bike lanes

Project Limits

5th St SE between 15th Ave SE and Oak St SE

Construction Start Date

Planned for 2014

Contact Information

Simon Blenski, 612-616-7345 or simon.blenski@minneapolismn.gov

Project Details

A segment of 5th St SE will be resurfaced in 2014. The street reconditioning project allows for a logical time to reconfigure lane striping and implement projects identified in the 2011 Minneapolis Bicycle Master Plan.

Project Layout

5th St SE Concept (pdf)

Project Updates

May 27, 2014

A project layout has been posted. The concept includes bike lanes on 5th St SE between 15th Ave SE and Oak St SE. The bike lanes will include a painted buffer for the majority of the corridor. To accommodate the bike lanes, one westbound travel lane will be removed between 15th Ave SE and 17th Ave SE. There will be no impacts to parking on 5th St SE. This layout was shared with the Minneapolis Bicycle Advisory Committee on May 20.

March 31, 2014

Initial scoping has determined that bike lanes can be installed on 5th St SE with no impacts to parking and minimal impacts to existing lane configurations.

 

Last updated May 27, 2014